I was born in Bafra / Samsun, 17/07/1957. I completed my primary and secondary education in Gümüşhane. In 1974-1975 academic year, I registered to the Faculty of Architecture of the Ankara State Academy of Engineering and Architecture and I completed my education in this school in 1981..

While I was still a student in 1979, I worked at “ÇAĞRIM İNŞAAT TİC.VE SAN A.Ş.” in Ankara / Çankaya until 1985;

I had worked the positions like Project Coordinator, Construction Site Supervisor, Deputy Contractor (especially at the tenders of the Ministry of Defense).

At October 1986, I worked as a “Final Account and Planning Engineer and Site Manager” in the construction of “GÜRİŞ İNŞAAT VE MÜHENDİSLİK A.Ş.”’s, “KEPEZ ELECTRICTY MANAVGAT DAM AND HYDROELECTRICAL POWER PLANT Construction” and as of the end of 1987 I left the company voluntarily. Together with Sadettin DURGUN and Aykut ÖZKAN, I established “YöN CONSTRUCTION AND ENGINEERING SERVICES TOURISM TRADE LTD.” Company in 1987, respectively completed the following works successfully;

 

1984 – 1987 – Antalya Manavgat Transformer Building Construction (Kepez Elk T.A.Ş) – Manavgat

1989 – Arif ŞEKER Business Center Construction – Kemer

1989 – 1990 – Doğa Motel Construction – Kemer 

1989 – 1992 – Antalya Lara Altinevler Building Koop. Construction of 270 Residence – Antalya

1993 – Side Palas Renovation Construction – Side

1993 – 1994 – Sezar Hotel and Resort Building – Belek

1994 – 1995 – Belgin Madeni Yağlar A.Ş. Factory Extension Construction G.O.S.B – Gebze

1995 – 1996 – North Sea Area Command Gokceada Officer Residences – Gökçeada

1995 – 1996 – North Sea Area Command Radar Road (8 km) – Gökçeada

1995 – 1996 – D.D.Y.Afyon Dinar 60000 m3 Ballast Supply (Stone quarry and crusher operation) – Dinar

But Due to the economic crisis in our country, I closed the firm in 2000 and returned to project management.

I worked as a “Project Manager” in the “MULTI TURK MALL TRABZON FORUM SHOPPING CENTER CONSTRUCTION ” of YORUM İNŞAAT A.Ş. upon my enquire to company after the company was going to slow down it’s projects in March 2007 and the company turned from the superstructure to the infrastructure works and I brought this work to the delivery stage on January 2008, I left the company.

In February 2008, Upon the invitation of Abdurrahman GÜRSOY who is the General Manager of “GÜRSOY CONSTRUCTION”, I work in this group as the HEAD OF SUPERSTRUCTURE GROUP and run the projects stated below:

 2006 – 2008 TRABZON FORUM MALL

2008 – 2010 KİPTAŞ HADIMKÖY 513 RESIDENCE CONSTRUCTION

2008 – 2010 – KİPTAŞ HADIMKÖY MOSQUE CONSTRUCTION

2008 – KİPTAŞ BAŞAKŞEHİR SPORTS FACILITIES AND MOSQUE CONSTRUCTION

2010 – 2012 – KİPTAŞ BAŞAKŞEHİR METROKENT 1013 RESIDENCE, SOCIAL FACILITIES AND SPORTS FACILITIES CONSTRUCTION

2012 – 2013 – CONSTRUCTION OF REGIONAL DIRECTORATE OF FOUNDATION’S ARCHERS LODGE

2013 – 2014 – THY & DOCO PARTNER ORTAKOY HATICE AND FEHIME SULTAN MANSIONS RESTORATION (HOTEL)

2014 – 2016 – ATAŞEHİR SİNAN THE ARCHITECT MOSQUE

2017 –  BISHKEK MALL KYRGYZSTAN

2018 – ESTON KORU PROJECT

.

Upon the request of Gür Yapı Construction Company General Manager Mr.Abdurrahman GÜRSOY I have worked in Kyrgyzstan Bishkek City in Kyrgyzstan for a short time to finish construction of shopping mall in Kyrgyzstan which belongs to another Turkish Businessman. Currently I am managing the construction of a private building of my own in the Kaşüstü/Yomra County of Province of Trabzon, and hold the positions of MTİ Construction General Coordinator and business partnership. I am married, I have two children.

Best regards,